• Assessment of the suitability of the building for Solar Power Plant (SPP) implementation
  • Simulation using software with historical meteorological data, shading analysis, facility layout, and site specific details
  • Energy production analysis, reporting of production values, calculation of investment payback periods, and feasibility study.
  • Preparation of the technical specifications related to the project and price quotation
  • Financial consultancy
  • Carry permission activities and monitoring and reporting the process
  • Obtaining approval from TEDAŞ (Turkish Electricity Distribution Company), and creating the structural project
  • Procurement of FV solar panels, inverters, cables and components
  • Construction
  • Installation of monitoring system, grounding and lightning protection, system room.
  • Required warning and notification systems
  • Conducting tests
  • Commissioning processes
  • Complete the legislative procedures
  • Maintenance
  • Panel cleaning